We offer complete and customized solutions for photovoltaic systems, catering to both individuals and businesses. We guarantee high energy efficiency, significant cost savings, and a positive impact on environmental sustainability. Trust our experience to build a greener future together!

TIRRENO POWER S.P.A. - Torrevaldaliga Sud thermoelectric power plant

  • Year of completion: 2025
  • Type of work/installation: Two photovoltaic systems of 1 MWp and 1,7 MWp
  • Place: Civitavecchia (RM)
  • Completion time: (in corso) Days

Last February, Amaranto Group and Byom signed an important agreement with Tirreno Power S.p.A., one of the leading companies in the Italian energy sector, for the development of innovative projects in the field of Energy Communities.

As part of this collaboration, our team at Energiaprima will contribute to the construction of two new photovoltaic systems at the Torrevaldaliga Sud Power Plant in Civitavecchia, in the province of Rome. With a total capacity of approximately 1 MWp and 1,7 MWp, these systems will make a significant contribution to clean energy production.


TIRRENO POWER S.P.A.

  • Year of completion: 2024
  • Type of work/installation: 998,985 kWp photovoltaic system
  • Place: Savona (SV)
  • Completion time: 80 Days

Following the agreement signed in February 2024 between Amaranto Group and Tirreno Power SpA - one of the leading electricity producers in Italy and owner of the Vado Ligure Thermoelectric Power Plant - a 998,985 kWp photovoltaic system was installed on the rooftop of the power plant, located in the municipalities of Valleggia di Quiliano and Vado Ligure.


THE "OASI DELLA GINESTRA" BY ROSA GIUSEPPE

  • Year of completion: 2024
  • Type of work/installation: 27,060 kWp photovoltaic system with a 30,72 kWh storage system and a 22 kW charging station
  • Place: Via Galardi, 59 - Cercemaggiore (CB)
  • Completion time: 4 Days

Installation of a 24,60 kWp photovoltaic system with a 51.20 kWh storage system and a 22 kW charging station

This system was implemented as part of the PNRR Measure, Mission 2, Component 1, Investment 2.2 "Agrisolar Park".

Main technical characteristics:

  • Installed capacity: 27,060 kWp
  • Photovoltaic modules: 66 photovoltaic modules, each with a capacity of 410 Wp
  • Inverters: 1 ZCS Azzurro 3 PH HYD 20000 ZSS inverter; 1 ZCS Azzurro 3 PH 5.5 KTL – V3 inverter
  • Energy storage system: 6 ZCS Azzurro HV ZBT 5K batteries (5.12 kWh each), for a total of 30,72 kWh
  • Charging station: 1 charging station with a capacity of 22 kW
  • Electrical panels: DC/AC electrical panels
  • Mounting structure for modules: made of aluminum profiles and clamps

DE MARINIS NICOLA AGRICULTURAL COMPANY

  • Year of completion: 2024
  • Type of work/installation: 24,60 kWp photovoltaic system with a 51,20 kWh storage system and a 22 kW charging station
  • Place: Via Monte Antico, Guglionesi (CB)
  • Completion time: 3 Days

Installation of a 24,60 kWp photovoltaic system with a 51.20 kWh storage system and a 22 kW charging station

This system was implemented as part of the PNRR Measure, Mission 2, Component 1, Investment 2.2 "Agrisolar Park".

Main technical characteristics:

  • Installed capacity: 24,60 kWp
  • Photovoltaic modules: 60 photovoltaic modules of 410 Wp each
  • Inverters: 2 ZCS Azzurro 3 PH HYD 10000 ZSS inverters
  • Energy storage system: 10 ZCS Azzurro HV ZBT 5K batteries (5.12 kWh each), for a total of 51,20 kWh
  • Charging station: 1 charging station with a capacity of 22 kW
  • Electrical panels: DC/AC electrical panels
  • Mounting structure for modules: made of aluminum profiles and clamps

 


EMMEPI S.R.L.

  • Year of completion: 2024
  • Type of work/installation: 100,040 kWp photovoltaic system
  • Place: Contrada Santa Calcagna, 130 - Rocca San Giovanni (CH)
  • Completion time: 6 Days

Installation of a 100,040 kWp photovoltaic system

Project implemented under the POR FESR Abruzzo 2014-2020 – Measure 4.2.1 AXIS IV – Promotion of a low-carbon economy. Public Notice “for the submission of investment projects for the construction and installation of plants for the production of energy from renewable sources and for the energy efficiency of buildings and production facilities.”

Main technical characteristics:

  • Installed capacity: 100,040 kWp
  • Photovoltaic modules: 244 monocrystalline silicon photovoltaic modules JAM4S30 410/MR 410Wp (or equivalent)
  • Inverter: 1 ZCS Azzurro 3 PH 100 KTL-LV inverter (with Wi-Fi) or equivalent
  • Electrical panels: AC/DC electrical panels
  • Mounting structure for modules: made of aluminum profiles and clamps, with 5° ballast tilt

A special thank you to So.Fi.A – Soluzioni Finanza Agevolata, our partner for facilitated finance solutions, for managing the consultancy aspect of the project.

 


NIRO LABEL S.R.L.

  • Year of completion: 2024
  • Type of work/installation: 86,100 kWp photovoltaic system
  • Place: Via Alcide de Gasperi n. 6 - Ripalimosani (CB)
  • Completion time: 11 Days

86,100 kWp photovoltaic system

Project implemented under the “POC Molise 2014–2020 – Axis III” measure, as part of the “Green & Energy Innovation – Incentives for the innovation of production processes aimed at promoting energy efficiency and sustainable development” call for proposals.

Main technical characteristics:

  • Installed power: 86,100 kWp
  • Photovoltaic modules: 210 photovoltaic modules rated at 410 Wp
  • Inverter: 1 ZCS Azzurro 3 PH 80 KTL-LV inverter with WiFi
  • Electrical panels: AC/DC panels for the management and control of the system
  • Support structure for modules: made of aluminum profiles and clamps.

SAN ZENONE SOCIAL WINERY COOPERATIVE

  • Year of completion: 2023
  • Type of work/installation: 175,94 kWp photovoltaic system
  • Place: Contrada Piana dei Pastini, snc - Montenero di Bisaccia (CB)
  • Completion time: 27 Days

Installation of a photovoltaic system of 175,94 kWp

This system was installed thanks to the PNRR Measure, Mission 2, Component 1, Investment 2.2 "Agrisolar Park”.

Main technical characteristics:

  • Installed power: 175,94 kWp
  • Photovoltaic modules: 463 mono-crystalline silicon modules JA SOLAR model JAM60S20 380/MR rated at 380Wp or equivalent
  • Inverters: 1 ZCS Azzurro 3 PH 60000TL-V1 (with Wi-Fi) or equivalent; 3 ZCS Azzurro 3 PH 30000TL-V2 (with Wi-Fi) or equivalent; 2 ZCS Azzurro 3 PH 15000TL-V3 (with Wi-Fi) or equivalent
  • Electrical panels: AC/DC panels for system management
  • Support structure: made with aluminum profiles and brackets for the photovoltaic modules

A special thanks to So.Fi.A - Soluzioni Finanza Agevolata , our partner for facilitated finance solutions, consulting, and reporting. A special thanks also to the Energia Prima O&M Srl fantastic staff for the design of the system.


MUNICIPALITY OF MIRABELLO SANNITICO

  • Year of completion: 2023
  • Type of work/installation: Photovoltaic system of 20.50 kWp with a storage system of 28,8 kWh and a hybrid system (boiler and heat pump)
  • Place: Via Roma, 101 - Mirabello Sannitico (CB)
  • Completion time: 7 Days

Installation of a photovoltaic system of 20,50 kWp with a storage system of 28,8 kWh and a hybrid system. 

This system was installed as part of the CSE 2022 – Municipalities for Sustainability and Energy Efficiency program and thanks to the collaboration with MDM greENgineering Srl, the engineering services company that managed the design activities.

 


DE VINCENZO COSTRUZIONI - Condominium on via Genova

  • Year of completion: 2023
  • Type of work/installation: Installation of photovoltaic systems with storage; replacement of condensing boilers; replacement of thermostatic valves
  • Place: Via Genova, No. 4 e 6 - Campobasso (CB)
  • Completion time: 7 Days

As part of the initiatives covered by the 110% Bonus and in collaboration with the company De Vincenzo Costruzioni , we have:

  • Installed two condominium photovoltaic systems of 18,04 kWp with an electric storage system of 24 kWh
  • Replaced 20 FERROLI Bluehelix Alpha wall-mounted condensing boilers
  • Replaced the thermostatic valves

MARIA PARENTE - Poultry farming

  • Year of completion: 2023
  • Type of work/installation: 34,44 kWp photovoltaic system
  • Place: C.da Valle, n°26 - Vinchiaturo (CB)
  • Completion time: 5 Days

Installation of a 34,44 kWp photovoltaic system

Project carried out under the PNRR Measure, Mission 2, Component 1, Investment 2.2 "Agrisolar Park".

Main technical characteristics:

  • Installed power: 34,44 kWp
  • Photovoltaic modules: 84 monocrystalline silicon panels, model JAM54S30 410/MR rated at 410 Wp (or equivalent)
  • Inverter: 1 ZCS Azzurro 3 PH 36KTL-V3 inverter (with WiFi) or equivalent
  • Charging station: 1 ABB AC TERRA 22 kW charging station (or equivalent)
  • Electrical panels: AC/DC panels for system management
  • Support structure for modules: made of aluminum profiles and clamps

A special thanks to So.Fi.A - Soluzioni Finanza Agevolata , our partner for facilitated finance solutions, consulting, and reporting. A special thanks also to the Energia Prima O&M Srl fantastic staff for the design of the system.


Energiaprima is a company of the Amaranto Group